--- frontmatter
name: rai-story-plan
description: >
  Decompose user stories into atomic executable tasks, identify dependencies,
  and create a deterministic implementation plan. Use after /rai-story-design
  has grounded the story's integration decisions.

license: MIT

metadata:
  raise.work_cycle: story
  raise.frequency: per-story
  raise.fase: "5"
  raise.prerequisites: project-backlog
  raise.next: story-implement
  raise.gate: gate-plan
  raise.adaptable: "true"
  raise.version: "1.0.0"

Plan: Implementation Planning

Purpose

Decompose user stories into atomic executable tasks, identify dependencies, and create a deterministic implementation plan that guides development.

Mastery Levels (ShuHaRi)

Shu (守): Decompose each story into atomic tasks with full verification criteria.

Ha (破): Adjust granularity based on complexity; parallelize when possible.

Ri (離): Create custom planning patterns for specific stacks or contexts.

Context

When to use:

  • After having prioritized stories in the backlog
  • Before starting feature implementation
  • For each story to be developed

Inputs required:

  • User stories for the feature to implement
  • Technical Design for architectural context (if complex)

Output:

  • Implementation plan: work/epics/e{N}-{name}/stories/f{N}.{M}-{name}/plan.md

Steps

Step 0: Emit Feature Start (Telemetry)

Record the start of the plan phase:

bash
rai memory emit-work story {story_id} --event start --phase plan

Example: rai memory emit-work story S15.1 -e start -p plan

Step 0.1: Verify Prerequisites (Deterministic)

Check design document for complex features:

bash
ls work/epics/e*/stories/{story_id}/design.md 2>/dev/null || echo "INFO: No design"

Decision:

  • design.md exists → Load and reference
  • design.md missing + Simple feature → Continue (design optional)
  • design.md missing + Moderate/Complex → Suggest /rai-story-design first

Skip condition: Simple features (per complexity matrix in /rai-story-design).

Verification: Design loaded OR simple feature confirmed.

If you can't continue: Complex feature without design → Run /rai-story-design first.

Step 0.5: Query Context

Load relevant patterns and calibration from unified context:

bash
rai memory query "planning estimation calibration" --types pattern,calibration --limit 5

Review returned patterns before proceeding. Key patterns inform task structure and sizing.

Verification: Context loaded; relevant patterns noted.

If context unavailable: Run rai memory build first, or proceed without patterns.

Step 0.6: Load Architectural Context

Identify the primary module(s) this story affects, then load their architectural context:

bash
rai memory context mod-<name>
# Example: rai memory context mod-memory

How to identify the relevant module(s):

  • From the story scope or design: which source module(s) will be modified?
  • Module names use mod- prefix (e.g., mod-memory, mod-graph, mod-session)
  • If unclear, check the epic scope for module references

What this returns:

  • Bounded context: Which domain this module belongs to
  • Layer: Architecture layer (leaf, domain, integration, orchestration)
  • Constraints: Applicable guardrails (MUST and SHOULD)
  • Dependencies: What this module depends on and what depends on it

How to use the context in planning:

  • Tasks that cross bounded context boundaries should be separate tasks
  • Layer dependency rules inform task ordering — lower layers first
  • MUST constraints should be addressed in task verification criteria
  • Dependencies inform which modules need testing together

If module not found: The module may not be in the graph yet. Continue without architectural context but note the gap.

Verification: Architectural context loaded OR gap noted.

Step 1: Select Story

Identify the next story to implement by priority.

Verification: Selected story has clear BDD/acceptance criteria.

If you can't continue: Story without criteria → Complete BDD criteria first.

Step 2: Decompose into Tasks

Divide story into atomic tasks:

  • Independent when possible
  • Individually verifiable
  • One commit per task

Task granularity guidance:

Feature SizeRecommended TasksRationale
XS (1-2 SP)1-2 tasksSingle-pass implementation
S (3-5 SP)2-3 tasksAvoid over-decomposition
M (5-8 SP)3-5 tasksBalance granularity and overhead
L (8+ SP)5-8 tasksConsider splitting the feature

T-shirt sizing guide:

SizeScopeTypical Duration*
XSSingle function/method, trivial change<15 min
SSingle component, straightforward logic15-30 min
MMultiple files, moderate complexity30-60 min
LCross-cutting, significant complexity1-2 hours

*Duration tracked for calibration, not commitment. AI-assisted velocity varies.

Task structure:

markdown
### Task N: [Name]
- **Description:** What to do
- **Files:** Files to create/modify
- **TDD Cycle:** RED (write failing test) → GREEN (implement) → REFACTOR
- **Verification:** How to verify completion (test command)
- **Size:** XS/S/M/L
- **Dependencies:** None / Task N

TDD Guidance (RED/GREEN cycles):

  • RED: Write a failing test first that defines expected behavior
  • GREEN: Write minimal code to make the test pass
  • REFACTOR: Clean up while keeping tests green
  • For infrastructure/setup tasks, TDD cycle may be optional

Verification: Each task is atomic and verifiable.

If you can't continue: Tasks too large → Divide until atomic. But avoid over-decomposition for simple features.

Required final task: Always include a manual integration test task as the last task:

markdown
### Task N (Final): Manual Integration Test
- **Description:** Validate story works end-to-end with running software
- **Verification:** Demo the story working (not just unit tests passing)
- **Size:** XS
- **Dependencies:** All previous tasks

This validates the implementation with real usage before marking the story complete.

Step 3: Identify Dependencies

Map dependencies between tasks:

  • Sequential vs parallel
  • External dependencies
  • Potential blockers

Verification: Dependency graph has no cycles.

If you can't continue: Circular dependencies → Refactor tasks to break cycles.

Step 4: Order Execution

Define optimal execution order:

  • Respect dependencies
  • Maximize parallelism
  • Quick wins first
  • Risk-first approach (riskiest tasks early)

Verification: Execution order defined.

If you can't continue: Ambiguous order → Prioritize by risk.

Step 5: Define Verification Per Task

For each task, define:

  • Completion criteria
  • Verification command (test, lint, etc.)
  • Rollback if fails

Verification: Each task has verification criteria.

If you can't continue: Verification unclear → Add specific test for the task.

Step 6: Document Plan

Create plan document with:

  • Ordered list of tasks with T-shirt sizes
  • Dependencies
  • Verifications
  • Duration tracking table (filled during implementation)

Verification: Plan documented and complete.

Step 7: Emit Feature Complete (Telemetry)

Record the completion of the plan phase:

bash
rai memory emit-work story {story_id} --event complete --phase plan

Example: rai memory emit-work story S15.1 -e complete -p plan

Output

  • Artifact: work/epics/e{N}-{name}/stories/f{N}.{M}-{name}/plan.md
  • Telemetry: .raise/rai/personal/telemetry/signals.jsonl (feature_lifecycle: plan start/complete)
  • Gate: gates/gate-plan.md
  • Next: /rai-story-implement

Plan Template

markdown
# Implementation Plan: {Feature Name}

## Overview
- **Feature:** {feature-id}
- **Story Points:** N SP
- **Feature Size:** XS/S/M/L
- **Created:** YYYY-MM-DD

## Tasks

### Task 1: {Name}
- **Description:** ...
- **Files:** ...
- **TDD Cycle:** RED → GREEN → REFACTOR
- **Verification:** `pytest tests/test_X.py`
- **Size:** S
- **Dependencies:** None

### Task 2: {Name}
- **Description:** ...
- **Files:** ...
- **TDD Cycle:** RED → GREEN → REFACTOR
- **Verification:** `ruff check src/`
- **Size:** XS
- **Dependencies:** Task 1

### Task N (Final): Manual Integration Test
- **Description:** Validate story works end-to-end with running software
- **Verification:** Demo the story working interactively
- **Size:** XS
- **Dependencies:** All previous tasks

## Execution Order
1. Task 1 (foundation)
2. Task 2 (depends on 1)
3. Task 3, Task 4 (parallel)
4. Task N - Manual Integration Test (final validation)

## Risks
- {Risk 1}: {Mitigation}

## Duration Tracking
| Task | Size | Actual | Notes |
|------|------|--------|-------|
| 1 | S | -- | (filled during implementation) |
| 2 | XS | -- | |
| N | XS | -- | Integration test |

References

  • Gate: gates/gate-plan.md
  • Next skill: /rai-story-implement